Kunming Information Port News (Kunming Daily reporter Liao Xingyang) On May 5th, the Development and Reform Commission of Yunnan Province issued a statement agreeing in principle to the review opinions on the energy-saving reports of the construction project of a 5000 ton coffee liquid production line for the annual production of 10000 tons of instant coffee powder by Yueran Coffee in Pu'er City (hereinafter referred to as "Yueran Coffee") and the annual production of 10000 tons of instant coffee powder processing project by Honghe Xingfei (Yunnan) Coffee Co., Ltd. (hereinafter referred to as "Xingfei Coffee").
The Yueran Coffee project covers a total area of 70.89 acres with a building area of 39152.60 square meters. It will be constructed in two phases and will have an annual production capacity of 10000 tons of instant coffee powder and 5000 tons of concentrated coffee liquid after completion. The first phase project is to build a production line with an annual output of 5000 tons of spray drying instant powder; The second phase of the project will construct a production line with an annual output of 5000 tons of freeze-dried instant powder and 5000 tons of concentrated coffee liquid. Supporting facilities such as coffee processing plants, research and development buildings, and sewage treatment stations will be constructed. After the completion of the project, the comprehensive energy consumption will be 26401.78 tons of standard coal (equivalent value) and 36865.94 tons of standard coal (equivalent value), and the total annual carbon dioxide emissions will be 13022.83 tons of carbon dioxide equivalent.
The Xingfei Coffee project is located in Gejiu City, Honghe Prefecture. It will construct one spray dried coffee powder production line and one freeze-dried coffee powder production line, mainly including production systems such as roasting area, crushing processing area, extraction processing area, as well as auxiliary ancillary systems such as natural gas boiler room and office. The project will be constructed in two phases. In the first phase, one spray dried coffee powder production line will be built, with an annual output of 5000 tons of instant coffee powder (spray dried); One freeze-dried coffee powder production line will be built in Phase II, with an annual output of 5000 tons of instant coffee powder (freeze-dried). After the completion of Phase II, an annual output of 10000 tons of instant coffee powder will be achieved. After the project reaches its production capacity, the comprehensive energy consumption will be 25615.10 tons of standard coal (equivalent value) and 33038.61 tons of standard coal (equivalent value). 【 Source: Kunming Information Port 】
